Als Antwort auf Jon Worth

@cstross

Oh, I can up that.

In Leipzig, an "H2 Power Plant" just opened.
More precisely, a gas turbine plant that's "H2 ready" (aka proper piping to contain H2 etc.)
For that glorious future time when "The Ring" is ✅ to distribute H2, from a terminal unloading ships of green H2. Or, in the nearer future, when the pipeline to the new electrolysis plant is ✅, using green power from surrounding solar and wind parks to generate H2.

You can't make this shit up.

lhyve.de/

Als Antwort auf Charlie Stross

@cstross If you've got enough of it l³/l² is on your side.

I'm not sure it's a good idea but I don't think it's so obviously idiotic that you can immediately assume it's a scam.

However, if somebody's saying their boiler (of whatever scale) is “hydrogen ready” without providing the rest of the system (electrolyser, storage, pipelines, etc) then, yeah, it's probably a scam.

@snaeqe @jon

Als Antwort auf Jon Worth

actually no.

#Batteries are shit and the #downtime due to #Charging is a huge cost factor.

Remember: At peak-efficiency taxis literally only.stop and turn off engines to offload/onload passengers change drivers, refuel or do unavoidable maintenance.

youtube.com/watch?v=B78-FgNqdc…
youtube.com/watch?v=SB9EARKvCT…
youtube.com/watch?v=AqHsXv7Umv…

Not to mention >99% of all airborne particle emissions are tire and brake dust.